ROOT IN CHINA, FACE THE WORLD!

ROOT IN CHINA, FACE THE WORLD!
English | 中文
  • ADD.:Dachang,Langfang City,China
  • TEL:+86-0316-5758158
  • FAX:+86-0316-8933298
  • E-MAIL:sales@kessolidscontrol.com
  • WEB:www.kestrenchless.com
  • MICRO-TUNNELING (PIPE JACKING)

    Micro-tunneling is a trenchless construction method used to install pipelines beneath highways, railroads, runways, harbors, rivers, and environmentally sensitive areas. Micro-tunneling is defined as a remotely-controlled, guided, pipe-jacking operation.

  • HDD

    Horizontal Directional Drilling (HDD) is an extremely versatile trenchless technology that is used for the installation of everything from service connections to residences and buildings, to pipes and cables under roadways and rivers.

  • PILING

    A pile or piling is a vertical structural element of a deep foundation, driven or drilled deep into the ground at the building site.

  • DIAPHRAGM WALL

    Diaphragm Wall are concrete or reinforced concrete walls constructed in slurry-supported, open trenches below existing ground.

  • RIVER SILT TREATMENT

    Mud Dewatering System can be used for the river silt treatment.

  • WASTE WATER TREATMENT

    Dewatering Unit is widely used for the waster slurry/water treatment.


ABOUT US
COMPANY PROFILE
QUALIFICATIONS
GLOBAL EXHIBITION
WORKSHOP
PRODUCTS
SOLIDS CONTROL EQUIPMENT
DEWATERING UNIT
MICRO-TUNNELING SLURRY PLANT
HDD MUD RECYCLING SYSTEM
PILING SLURRY SEPARATION PLANT
PIPE JACKING MACHINE
HDD MACHINE
APPLICATIONS
MICRO-TUNNELING (PIPE JACKING)
HDD
OTHER CIVIL CONTRUCTIONS
SERVICE CENTER
VIDEO CENTER
PRODUCT CATALOGUE
SERVICE STANDARD
INDUSTRIAL STANDARD
NEWS
COMPANY NEWS
INDUSTRY UPDATE
CONTACT
www.kestrenchless.com

Headquarter: Tel:+86-0316-5758158   Fax:+86-0316-8933298   Xi'an Office: Tel:+86-029-87579681 / 87579682  Fax:+86-029-86613026
E-mail:sales@kessolidscontrol.com @2017 KES ENERGY EQUIPMENT MANUFACTURING HEBEI CO., LTD